Non-Standard Custom Tool Lead Time and Cost: A Breakdown Table from Drawing to Batch
November 19, 2026 · 铸屹精密
This article condenses the custom tool journey into one table: stages (drawing review, blank, first article, trial, revision, batch), typical durations for simple and complex geometry, and the cost block that dominates each stage. Engineering time dominates the first article; blank sourcing dominates urgent orders; coating logistics dominate the revision loop. It shows how to read a supplier's quoted lead time against this table, which compressions are safe (parallel blank sourcing, pre-agreed acceptance criteria) and which are risky (skipping the trial article), and gives a realistic 2-6 week planning envelope with payment milestones tied to stage exits.